Buying a fixer-upper is only clever if you know in advance which defects you are buying. Cosmetic misery (a dated kitchen, a worn floor, walls you paint yourself) is cheap and visible. The defects that make you poor sit in the foundations, the structure, the roof, the services and the damp. And those are exactly the things you do not see during a twenty minute viewing. So the difference between a good and a bad fixer-upper is not a feeling. It is research.
One thing up front: the amounts, rules and schemes in this article are Dutch. The way of thinking works anywhere, the figures and authorities are from the Netherlands.
To be blunt: repairing foundations quickly costs 40,000 to 100,000 euros per house and cannot be insured. The Dutch Knowledge Centre for Foundation Problems (KCAF) estimates that around one million Dutch homes are at risk of foundation damage. A building survey costing a few hundred euros does not even look there. Source: KCAF
Below is the complete approach: how to look at a property in three levels, which five dealbreakers you have to rule out before you bid, what you can spot yourself in half an hour, what a survey does and does not do, cost benchmarks you can calculate with, which clauses you want in the purchase contract (and which you do not), how to finance it with a building deposit, NHG and the national heat fund, what happens to your insurance the moment the house sits empty, in which order you renovate, and when to simply say no.
Three levels of fixer-upper: know what you are buying
Everyone calls everything a “fixer-upper”. But there are three completely different risk profiles underneath, and they demand a different budget, a different schedule and a different kind of financing.
| Level | What is going on | Roughly budget for | Do it yourself? |
|---|---|---|---|
| 1. Cosmetic | Dated but technically sound: kitchen, bathroom, floors, paintwork, garden | 15,000 to 50,000 euros | Largely yes |
| 2. Technical | Roof, window frames, electrics, heating, insulation, damp, drainage all need replacing | 50,000 to 120,000 euros | Partly, contract out the services |
| 3. Shell / full gut | Structure, foundations, completely new layout, sometimes uninhabitable during the works | 120,000 euros and well beyond | Only with professional supervision |
Here is the nasty bit: a house that looks like level 1 can simply be level 3. A fresh coat of paint over a crack is the cheapest way to sell a house. That is why this article does not start with the kitchen, but with the things you cannot see.
The five dealbreakers: rule them out before you bid
These are the five items that turn a nice project into a money pit. They have one thing in common: they all cost more than a complete new kitchen, and they are all largely invisible.
1. The foundations
Houses built before 1970 in areas with soft ground often stand on timber piles. If those piles are left dry by a low groundwater table, oxygen gets in and fungi start eating the wood. That is called pile rot. On top of that there is bacterial attack (known in Dutch as “palenpest”), which carries on even under water.
Warning signs: cracks in the facade that get wider towards the top or the bottom, doors and windows that stick, sloping floors, a facade that is out of plumb, a threshold that is no longer level.
The test that takes five minutes: put a marble in the middle of the floor in every room. If it consistently rolls the same way in several rooms, something is subsiding. Hold a spirit level against the frames. And walk around outside along the facade: look at whether the brickwork above the windows and at the corners is cracking.
What certainty costs: a QuickScan (archive research, visual inspection and measurements, non-destructive) costs roughly 350 to 650 euros and gives you a risk assessment. A full foundation investigation with an inspection pit costs roughly 4,000 to 9,000 euros and takes about two months. Repair: roughly 40,000 to 100,000 euros or more. And again: foundation damage cannot be insured. Source: KCAF
In practice: if you are buying a pre-1970 house in a risk area, request the foundation risk report from the council, and consider making a QuickScan a condition of the purchase contract. For a few hundred euros you avoid a surprise of tens of thousands.
2. Timber decay and rot fungus
Dry rot and house longhorn beetle in floor joists and joist ends are silent destroyers. The joist ends buried in the brickwork are especially vulnerable, because that is where damp gets in.
Warning signs: a musty cellar smell, discoloured wood or wood cracked into cubes (brown rot), white or yellow-brown thread-like growth, floors that bounce, a skirting board that goes soft when you push a screwdriver into it.
What you do: ask permission to open the crawl space hatch. Climb in, or at least put your head and a good lamp in there. If you see standing water, a white fungal bloom or wood crumbling away, this is level 3, not level 1. Repairing floor joists and joist ends runs into the tens of thousands fast.
3. Asbestos
Asbestos has been banned in the Netherlands since 1994. If your house or shed predates that year, there is a real chance asbestos is built into it: in corrugated sheeting, in vinyl flooring and the adhesive layer underneath, in chimney flues, behind the boiler, in planters, in soil stacks and in the notorious board behind the meter cupboard.
What you do: ask whether there is an asbestos survey. If there is not and the house predates 1994, budget at least an amount for the investigation. A type A asbestos survey costs roughly 400 to 800 euros for a house. Removal is more expensive: stripping an average asbestos roof often runs into the thousands, depending on surface area and access.
Watch the clause: purchase contracts for older houses often include an asbestos clause. It puts the cost of any removal on you as the buyer, not on the seller. Read it, and factor it into your bid.
4. The electrics and the gas pipework
An old installation with screw fuses, two circuits, no RCD and fabric-sheathed cable is not “needs a bit of tidying up”. That is a complete rewire.
Warning signs: an old fuse box instead of a consumer unit with circuit breakers, cotton or lead sheathed cable, sockets without an earth pin, no RCD, no earth electrode or earth conductor visible at the water meter.
Costs: a new consumer unit costs roughly 800 to 2,000 euros fitted, depending on the number of circuits and the supply. Rewiring a house completely often lands in the order of 5,000 to 15,000 euros, heavily dependent on size, the number of points, and whether the walls are coming open anyway.
And the gas pipework: old gas pipes in cast iron or uncoated steel, or a connection that has not been checked in decades, should be inspected by a certified installer before you use it.
5. Lead water pipes
Until 1945 it was entirely normal to install lead drinking water pipes. They can still be present in houses built between 1945 and 1960 too. Since 1960 they have no longer been used. The Dutch public health institute RIVM states that there is no safe lower limit for lead exposure. Source: Rijksoverheid
How to recognise it: lead pipes are dull grey and soft. Scratch them with a key or a knife: if a shiny, silver coloured stripe appears, it is lead. Lead pipes also often have thick, bulging soldered joints instead of neat fittings.
What you do: replace them. For an average house, reckon on a few thousand euros to replace the internal pipework, more if the pipes are buried in the walls. The section from the street to your meter belongs to the water company, so report it there as well.
Looking for yourself: what you can spot in half an hour
Take this to every viewing: a torch, a 60 centimetre spirit level, a marble, a screwdriver, a damp meter (they cost 20 to 40 euros) and your phone for photos. Seriously. You are about to spend tens of thousands of euros on the basis of this half hour.
Outside:
– Walk right around the house and sight up along the facade (with your eye close to the wall). Is it bulging? Is it out of plumb?
– Cracks: photograph them with a coin next to them for scale. Stepped cracks running through the pointing and cracks wider than a few millimetres are a reason for further investigation.
– Roof slope: are the tiles in a straight line? Is the ridge sagging? Is there moss, are tiles missing, are the ridge tiles still fixed?
– Gutters and rainwater downpipes: green growth on the facade below the gutter means water has been running down it for years.
– Pointing: if you can scrape the mortar out with a key, repointing is a separate item (reckon on roughly 40 to 90 euros per m² of facade if you contract it out).
– Window frames: push your screwdriver into the bottom rails and the bottom corners. If it sinks straight in, that is wet rot.
Inside:
– Marble test on every storey.
– Spirit level against window frames and door posts.
– Damp meter on the bottom 50 centimetres of the external walls, and in the corners of the bathroom and the north-facing bedrooms.
– Use your nose. Mould, cellar smell and mustiness are signals, even when you see nothing.
– Crawl space hatch open, lamp in. Water? Mould? Loose sand? Insulation hanging down?
– Meter cupboard: number of circuits, RCD present, type of wiring, main supply (single or three phase), and whether there is any space left.
– Boiler: photograph the data plate, note the year of manufacture. A boiler older than 15 years is a replacement item.
– Loft: check the roof boarding from the inside for damp patches and for daylight coming through at the tiles.
– Windows: is there a mark in the glass with a date? Thirty year old double glazing with a failed seal (misting between the panes) needs replacing.
Always request from the seller’s agent: the seller’s questionnaire and the list of fixtures and fittings, the energy label, earlier building reports, the asbestos survey, and for an apartment the long-term maintenance plan and the annual accounts of the owners’ association, plus the building drawings held by the council. Owners’ associations are now required to hold a reserve fund. If that fund is practically empty while the roof needs replacing, you are buying a future one-off levy along with the flat.
The building survey: what it does and what it does not
A building survey costs roughly 300 to 600 euros in practice, depending on the type of property, its size and the region. A more extensive NHG survey sits slightly above that. The surveyor assesses the directly visible and accessible parts: roof, facades, floors, frames, structural elements and the main services, with photos and a cost estimate for immediate repairs and longer-term maintenance.
And now the part that surprises people. A standard survey:
– Opens nothing up. Whatever sits behind a wall, under a floor or under tiles stays unknown.
– Does not assess the foundations. That is what a foundation investigation is for.
– Does not fully test your electrics and usually does not measure insulation resistance.
– Does not inspect your drains with a camera.
– Does not carry out an asbestos survey.
How to get more out of it:
1. Walk around with the surveyor during the inspection. You will learn more about that house in two hours than from ten pages of report.
2. Ask in advance for a cost estimate split into “immediately necessary”, “within 5 years” and “maintenance over time”. Only that first figure belongs in your negotiation, the rest belongs in your multi-year budget.
3. Ask explicitly about the five dealbreakers above, and have the surveyor state in the report what they were not able to assess. That sentence is your ammunition for further investigation.
The cost of a building survey is, incidentally, deductible as purchase costs for your own home in the Netherlands, provided you actually buy the property and live in it yourself.
Extra investigations that are worth it:
| Investigation | When | Roughly |
|---|---|---|
| Foundation QuickScan | Built before 1970, soft ground, cracks | 350 to 650 euros |
| Full foundation investigation | If the QuickScan says “medium” or “high” | 4,000 to 9,000 euros |
| Type A asbestos survey | Built before 1994 | 400 to 800 euros |
| Camera drain inspection | Built before 1980, smell complaints, subsidence | 150 to 400 euros |
| Structural engineer | If you want to remove a wall or change the layout | 500 to 2,000 euros |
Costing the job: benchmarks you can work with
You value a fixer-upper with a simple principle: market value after renovation, minus renovation costs, minus a buffer, is your maximum bid. Renovation costs also keep rising structurally, so do not calculate with prices from three years ago.
The amounts below are realistic ranges for contracted-out work in an average family house. If you do it yourself, 40 to 60 percent often falls away (the labour share), but not for services work where you need certification.
| Item | Realistic range (contracted out) |
|---|---|
| Complete bathroom, including tiling and sanitaryware | 8,000 to 20,000 euros |
| Complete kitchen, including connection | 7,000 to 25,000 euros |
| New consumer unit | 800 to 2,000 euros |
| Complete rewire of a house | 5,000 to 15,000 euros |
| Replace the boiler | 2,000 to 4,000 euros |
| Replace flat roof covering | 80 to 150 euros per m² |
| Renew a tiled roof including battens and membrane | 100 to 200 euros per m² |
| Replace window frames (uPVC or timber, with HR++ glazing) | 700 to 1,500 euros each |
| Crawl space floor insulation | 30 to 60 euros per m² |
| Cavity wall insulation | 20 to 40 euros per m² |
| Roof insulation from the inside | 60 to 120 euros per m² |
| Plastering walls | 25 to 45 euros per m² |
| New flooring (laminate up to solid timber) | 25 to 120 euros per m² |
| Remove a load-bearing wall including steel beam and calculations | 3,000 to 8,000 euros |
Two rules of thumb that will save you a lot of misery:
- Add 15 to 20 percent contingency at level 2, and 25 percent at level 3. Not because you plan badly, but because you only find out what is behind a wall once the wall is out.
- Calculate in square metres, not in feelings. Measure every room, work out the m² of wall, floor and ceiling, and cost it per m². That is the difference between a budget and a wish.
The costs everybody forgets
This is where budgets fall apart. Not on the kitchen, but on the items below.
- Temporary accommodation. If you cannot live there during the works, you carry housing costs twice. Six months of renting quickly adds up to 6,000 to 12,000 euros, plus storage for your furniture (100 to 250 euros per month).
- Waste removal and skips. A builder’s skip costs roughly 200 to 500 euros each, depending on size and contents. For a full strip-out you will need several. Rubble, plasterboard and timber also have to be separated.
- Site power and water. Getting the connections reactivated, or arranging a temporary supply.
- Hiring tools and machinery. Scaffolding, a concrete drill, a floor sander, a tile cutter: several hundred euros before you know it.
- Permit fees. Councils normally charge a percentage of the build cost. Reckon on hundreds to a few thousand euros for a planning permit.
- Extra work driven by regulations. If you renovate a large part of your house, you often have to return at minimum to the level of the existing situation, and for some works to new-build standard (think insulation values when replacing a roof).
- Interest during the build. You pay mortgage interest on the full amount borrowed, including the part still sitting in the building deposit. You do get an interest credit on that balance, but usually not one for one.
- Your own time. Doing it yourself is not free money. Work out how many weekends you genuinely have available, and be honest.
Bidding and the contract: where you actually sort it out
You do not buy a fixer-upper at the viewing, you buy it in the purchase contract. Four things to have sharp.
1. A survey condition. Put it in, and add a monetary threshold. For example: “the buyer may withdraw from the agreement if the building survey shows that the cost of immediately necessary repairs exceeds X euros.” Without an amount it is often worthless, because every old house has defects.
2. A financing condition. Obvious, but with an extra dimension for a fixer-upper: your financing has to cover the renovation as well. So word it around the total amount including the renovation, not just the purchase price.
3. The age clause. Sellers of older properties often include this. It limits the seller’s liability for defects that go with the age of the house and that they did not know about themselves. Under Dutch law the seller has a duty to disclose and you as buyer have a duty to investigate. A defect you could have found with reasonable investigation cannot be claimed later. What does remain claimable: deliberately concealed defects, such as a leak that has been neatly painted over.
4. The asbestos clause. Standard on older properties: any removal is at the buyer’s expense. Fine, as long as you have built those costs into your bid.
A negotiating tip that genuinely works: do not go in with “it is a doer-upper, so I am offering less”. Go in with a report and a quote in your hand. “This says the roof has to be replaced within two years, and here is the quote for 18,000 euros” is a completely different conversation than a feeling.
The financing: how to pay for a fixer-upper
This is exactly where a fixer-upper works differently from a move-in-ready house. Four building blocks.
Valuation based on the value after renovation
Have the valuer determine not only the current market value but also the value after renovation, based on a renovation specification (a worked-out list of measures with amounts). The bank can base your mortgage on that higher value. No specification means no post-renovation value, so you draw up that list before you apply for financing.
The building deposit
The amount for the renovation goes into a building deposit held by your lender. You claim invoices from it and receive an interest credit on the part still sitting in there.
What to watch:
– The term. For existing properties lenders often apply a shorter term than for new builds, in practice regularly around 6 months to 2 years, depending on the bank and the scheme. Ask about this explicitly before you sign, because if your deposit expires while the job is still running, the remaining balance comes off your mortgage and you are left without money.
– The invoice requirements. Invoices usually cannot be older than six months, the contractor has to be registered with the chamber of commerce, and under NHG the invoice date has to fall after the application date of the mortgage offer. Claiming DIY materials is often possible, but not always, and your own labour almost never.
– Keep everything. Every receipt, every invoice, every payment.
Extra borrowing capacity for energy efficiency
There is serious money here for a fixer-upper. You may borrow a maximum of 100 percent of the property value, but for energy saving measures you may go 6 percent above that. On top of that, when the bank works out your maximum mortgage based on income, it counts extra capacity depending on the energy label of the property: a house with label E, F or G brings 20,000 euros extra, label C or D 15,000 euros, and A to B 10,000 euros. The condition is that you actually spend that amount on saving energy. Qualifying measures include roof, floor and wall insulation, HR++, triple or vacuum glazing, insulated frames and doors, a heat pump, solar panels and energy efficient ventilation. Source: Milieu Centraal
Watch the difference between two variants. With Energiebesparende Voorzieningen (EBV), meaning specified energy saving measures, you know exactly what you are doing in advance and you supply a specification. With an Energiebespaarbudget (EBB), an energy saving budget, you only agree a total amount and decide later what you spend it on. Not every lender offers that second option.
With NHG: the cost limit in 2026 is 470,000 euros, and 498,200 euros if you spend the amount above that first limit entirely on energy saving measures. Source: NHG
The national heat fund
Separately from your mortgage you can borrow from the Nationaal Warmtefonds, the Dutch national heat fund, for energy efficiency work. Households with a combined income up to 60,000 euros per year can qualify for 0 percent interest. Above that, fixed rates apply that vary by term, in the order of around 4 percent for terms of 7 to 20 years. The rate is fixed for the whole term. Source: Nationaal Warmtefonds
There is also the ISDE grant for insulation, heat pumps, solar water heaters and (recently) ventilation. Amounts and conditions change every year, so check the current scheme and the approved product list at the RVO before you order anything. An important detail people discover too late: with most grants you have to apply after the work is done but within a set period, and you have to have the measure carried out according to the stated requirements (think minimum Rd values and minimum surface areas). So do not order anything before you have read the conditions.
And the tax side
If you buy the property as your main residence, you pay 2 percent transfer tax. For a property you do not use as your own main residence, a rate of 8 percent applies from 2026 (it used to be 10.4 percent). If you are between 18 and 35 and buying your first home, you may qualify for the first-time buyer exemption of 0 percent, provided you meet all the conditions and the property value stays below the annually set limit. Check that limit with the Dutch tax authority, because it is adjusted every year. Source: Belastingdienst
Insurance: the item almost every guide skips
Hey, this is the big blind spot. The moment your house sits empty or goes into renovation, your cover changes.
Most buildings and contents policies contain a vacancy clause. If the property stands empty for longer than a set number of months (often two to three), or if it is unfurnished, cover for theft and vandalism is often limited or excluded entirely. A major renovation also has to be reported in advance. If you do not, the insurer can pay out less or nothing at all in the event of a claim, and in many policies the guarantee against underinsurance lapses as well.
What you do, concretely:
1. Call your insurer before completion and report: empty yes or no, renovation yes or no, expected duration, and whether demolition work or an open roof is involved.
2. Ask for written confirmation of what is and is not covered.
3. Make sure the house is lockable from day one: good cylinders, windows shut, no ladder in the garden, no tools on view.
4. Is a contractor working there? Ask for their Contractors All Risks insurance and their liability insurance, and check whether your work falls under it.
5. Doing it yourself and hiring someone by the hour? Check your liability insurance, because you are the client in that case.
Permits and rules: what you can just do and what you cannot
A lot of internal work is permit-free, but that does not mean rule-free. Two things to keep an eye on at the same time.
Definitely requiring a permit:
– Structural work such as removing a load-bearing wall, making a larger opening in a load-bearing structure, or installing a heavier floor.
– Most extensions, dormers on the front elevation and facade changes that alter the appearance (there is more permit-free scope at the rear).
– Almost anything to a national or municipal listed building, or a property in a protected townscape or village setting, including internally. If you are buying that kind of house, ask the council what is allowed before you bid.
– Splitting a property into units, or changing its use.
Even without a permit: you have to meet the building regulations. For a renovation that is usually the “lawfully acquired level” (the level of the existing, legally built situation), with a statutory minimum for some elements. If you replace your entire roof covering, for example, or tackle a complete facade, insulation requirements apply. If you replace the electrical installation, the standard for electrical installations applies.
In practice: call the council before you bid if you have big plans. Ask about the local plan, whether the property is listed, and whether anything is known about foundation problems in the street. That conversation is free and can shift your bid by tens of thousands of euros.
The right order of works
This is where DIYers lose the most time and money: the wrong order. The rule is simple: outside to inside, structure to finish, and dirty to pretty.
- Make it wind and watertight. Roof, gutters, frames, glazing, facade. Everything you do inside is pointless as long as the rain gets in.
- Demolish and strip out. Everything that has to go, in one go. Skip at the door, waste separated.
- Structural work. Walls out, beams in, floors strengthened, stairwell opening formed. With calculations from a structural engineer.
- Deal with damp. Crawl space, rising damp, ventilation. Do this later and you are just working over a problem.
- First fix services. Electrics, water, waste, heating, ventilation, data. Run all the pipes and cables while the walls are still open. Photograph every wall with services in it before you close it up, with a tape measure in shot. You will be very glad of that in five years.
- Insulate. Floor, cavity, roof, and only then make it airtight.
- Board out and plaster. Plasterboard, plaster, ceilings.
- Floors. Levelling, underfloor heating, screed, finish floor.
- Second fix services. Sockets, switches, lighting, radiators, sanitaryware.
- Kitchen and bathroom.
- Painting and finishing. Skirtings, doors, final coat.
Sensible to do yourself: stripping out, insulating, plasterboarding, plastering (with practice), painting, laying floors, fitting the kitchen, tiling, the garden.
Sensible to contract out: structural work, roof work at height, gas pipework, and anything involving certification, warranty or safety. In the Netherlands you are allowed to do the electrics in your own home as a private individual, but the installation still has to meet the applicable standard. If you are in any doubt, at least have it commissioned and checked by an installer.
Planning: be honest with yourself
A complete renovation of an average fixer-upper takes six to twelve months in practice, from permit application to completion, and that is when things go well. If you do most of it yourself alongside a job, eighteen months is more realistic than six.
Calculation tip: estimate your job in weekends and multiply by 1.5. That is not pessimism, that is experience. Waiting times for installers, lead times for window frames and a council that takes six to eight weeks over a permit are not in your diary.
Seven moments when you simply say no
- The seller will not allow a building survey or will not accept a get-out condition.
- There are clear foundation warning signs and the seller will not have a QuickScan done.
- The house is in an area with known foundation problems, was built before 1970, and there is no report of any kind available.
- You need the permit for the plan that makes the house viable, and the council gives no indication at all that it is possible.
- Your financing rests entirely on “we will see” instead of on a renovation specification and a post-renovation valuation.
- Your buffer is zero. You do not start a shell renovation without 15 to 25 percent contingency.
- The sums do not add up: purchase price plus renovation plus buffer plus buying costs comes out above what comparable, move-in-ready houses in the same street fetch. In that case you are buying yourself poor in a good house.
A worked example: making it concrete
Say: a 1960s mid-terrace of 100 m², asking price 275,000 euros. Comparable, renovated houses in the street go for around 400,000 euros. Sounds like a lovely margin.
| Item | Amount |
|---|---|
| Purchase price | 275,000 |
| Buying costs (2% transfer tax, notary, valuation, advice) | around 12,000 |
| Building survey, foundation QuickScan, asbestos survey | around 1,500 |
| Renew the roof (60 m² tiled roof) | 9,000 |
| Window frames and HR++ glazing (10 of them) | 12,000 |
| Complete rewire including consumer unit | 10,000 |
| Boiler and radiators | 5,000 |
| Floor, cavity and roof insulation | 12,000 |
| Bathroom | 12,000 |
| Kitchen | 12,000 |
| Plastering, floors, painting | 18,000 |
| Skip, tools, site power, permit fees | 4,000 |
| Temporary accommodation for 6 months | 9,000 |
| Subtotal | 391,500 |
| Contingency of 20% over the renovation costs (94,000) | 18,800 |
| Total | 410,300 |
And against that sits a house worth 400,000 euros. So with everything contracted out you are not making anything. If you do a substantial part yourself, a large chunk of the labour share disappears from the plastering, floors, painting, insulation, bathroom and kitchen items, and the picture shifts towards 330,000 to 350,000 euros. Then there is margin in it.
That is exactly the lesson: with a fixer-upper you do not earn on the purchase, you earn with your own hands. So always run the sums twice, once fully contracted out and once with your realistic own input. The difference between those two is your actual profit, and immediately the answer to whether this house is right for you.
Seven mistakes you do not want to make
- Bidding without a report. Every bid without a survey is a six figure gamble.
- Only looking at the visible misery. A dirty kitchen is cheap. A wet crawl space is not.
- Forgetting that you have to live somewhere. Double housing costs are the quietest budget killer.
- Calling the council too late. A listed status or a local plan that blocks your scheme is something you want to discover before you bid.
- Not understanding the building deposit. A deposit that expires while the job is still running costs you the rest of your budget on the spot.
- Not telling your insurer. A fire during an unreported renovation is a disaster with a second disaster inside it.
- Working in the wrong order. Breaking open a freshly plastered wall for a forgotten cable hurts on every front.
Frequently asked questions
What should you look out for when buying a fixer-upper?
Five things you cannot see at a viewing: the foundations, timber decay and rot fungus in floors and joist ends, asbestos in anything built before 1994, the condition of the electrics and gas pipework, and lead water pipes in houses built before 1960. Everything you can see (kitchen, bathroom, floors, paintwork) is relatively cheap and easy to estimate. Always have a building survey done, and for older properties on soft ground add a foundation QuickScan.
What does a building survey cost and what does it include?
Roughly 300 to 600 euros in practice, depending on property type, size and region. The surveyor assesses all directly visible and accessible parts: roof, facades, floors, frames, structure and the main services, with photos and a cost estimate. What is not included: the foundations, an asbestos survey, camera inspection of the drains, and anything behind walls or under floors. So ask explicitly for the report to state what the surveyor was unable to assess.
Can you finance a renovation through your mortgage?
Yes. You have the valuer determine the value after renovation alongside the current value, based on a renovation specification, and the bank can base your mortgage on that higher value. The renovation amount goes into a building deposit that you claim from against invoices. For energy saving measures you may also borrow up to 6 percent above the property value, and the bank counts extra borrowing capacity depending on the energy label (20,000 euros for label E, F or G, 15,000 euros for C or D, 10,000 euros for A to B), provided you genuinely spend that amount on saving energy.
How much contingency should I hold for unforeseen costs?
For a house that is technically largely sound and where you are mainly doing finishes: 10 to 15 percent over the renovation costs. For a house where the services, roof and insulation all come out: 15 to 20 percent. For a shell renovation where you change the layout and touch the structure: 25 percent. That buffer is not a luxury. The moment the first wall comes open is the moment you really find out what you bought.
Do I have to tell my insurer about the renovation?
Yes, and a lot of people forget it. You have to report vacancy and a major renovation in advance. If a property stands empty for more than a few months or is unfurnished, cover for theft and vandalism is often limited or excluded. If you do not report a renovation, the insurer can pay out less or nothing in the event of a claim, and in many policies the guarantee against underinsurance lapses too. Always ask for written confirmation of what is covered.
Which clauses will I come across in the contract for an old house?
Mainly the age clause and the asbestos clause. The age clause limits the seller’s liability for defects that suit the age of the property and that they did not know about. The asbestos clause puts the cost of any asbestos removal on you. Both are common and not unreasonable as such, as long as you factor them into your bid. What a seller can never cover: defects they knew about and deliberately concealed.
In what order do I renovate a fixer-upper?
Outside to inside. First wind and watertight (roof, gutters, frames), then strip out, then structural work, then deal with damp, then first fix the services, then insulate, then board out and plaster, then floors, then second fix the services, then kitchen and bathroom, and last of all painting and finishing. Photograph every wall with services in it before you close it up, with a tape measure in shot.
In short: buying a fixer-upper is arithmetic, not romance. First rule out the five dealbreakers (foundations, timber decay, asbestos, electrics and gas, lead pipes), have it surveyed with a get-out condition that includes a monetary threshold, cost your renovation per square metre instead of by feel, add a buffer of 15 to 25 percent, arrange your financing with a renovation specification and a post-renovation valuation, tell your insurer about the vacancy and the renovation, and work in the right order.
Do that, and you are not buying a risk, you are buying a project. And a project with a good plan is exactly where doing it yourself starts to be fun.
Want to know exactly what you can build into a house and how to go about it? At Fred’s DIY Plans you will find worked-out building plans and project guides with a materials list, a cut list and step by step instructions, so you know what you need before the first cut. Have a look here.
Cheers, Fred Schouten, builder and DIYer through and through
PS: take a marble to every viewing. Put it in the middle of the floor in every room. If it rolls the same way everywhere, you have the most important information of the whole day within ten seconds. Small tip. Big difference.