What is a cover slab?

A cover slab is a flat slab placed on top of a wall, column, beam or foundation to spread loads, protect the element or finish ...

What is a top-beam yoke (dekbalkjuk)?

A top-beam yoke is a simple yoke or bent in which two short posts are tied together at the top by a horizontal beam, used ...

What is a top-beam frame (dekbalkgebint)?

A top-beam frame (Dutch: dekbalkgebint) is a timber frame in which a horizontal beam rests on top of two vertical posts, typical of traditional hall-house ...

What is the final design (DO)?

The final design (DO) is the design stage in which the preliminary design is developed into a permittable plan with final materials, dimensions and construction ...

What is a sub-designation in a zoning plan?

A sub-designation is an additional, more specific land-use designation within a primary zoning category that lets a municipality fine-tune what is allowed on each part ...

What is the threshing floor?

The threshing floor is the central, elongated floor of a hall-house barn used for threshing grain, storing harvest and unloading wagons.

What are decorations in construction?

Decorations in construction are non-structural ornaments and embellishments on façades, ceilings and interiors that enrich a building aesthetically and tell its story.

What is deconstructivism?

Deconstructivism is a 1980s architectural movement that breaks the classical rules of form, line and symmetry with fragmented, tilted and unstable shapes.

What is flow rate?

Flow rate is the volume of a liquid or gas passing through a pipe, duct or opening per unit of time, used widely in ventilation, ...

What is DBFM(O)?

DBFM and DBFMO are integrated construction contracts in which design, build, finance and (often) maintenance and operation are bundled with a single contractor.

Categories

.

Fred’s DIY Plans