**The final design — known in Dutch as the definitief ontwerp (DO) and roughly equivalent to RIBA Stage 3 / 4 or HOAI Lph 3 — is the design stage in which the preliminary design is developed into a permittable plan with final materials, dimensions, colours and construction details.** It marks the end of the design phase and is the basis for the permit application, the tender and the specification.

Place in the construction process

A typical Dutch design process has five phases (STB 2014):

1. Initiation / feasibility 2. Concept design (SO) 3. Preliminary design (VO) 4. Final design (DO) 5. Technical design / specification (TO)

In the final design, material choices for joinery, services and finishes are locked in. Later changes are possible but become increasingly costly.

Contents of a final design

A typical final design includes:

Application

The final design is the basis for:

A solid final design prevents major design decisions from being taken on site, where they are expensive and risky.

Related terms