Supplementary reinforcement is additional steel reinforcement placed at specific locations in a concrete structure to resist local stress concentrations. These are reinforcement bars added alongside the regular main and distribution reinforcement at points where extra tensile forces or cracking risks occur.

When is supplementary reinforcement needed?

Practical workflow

  1. Calculation — the structural engineer determines where supplementary reinforcement is required
  2. Drawing — the additional bars are shown as separate positions on the reinforcement drawing
  3. Fixing — the steel fixer places the supplementary bars at the indicated locations
  4. Inspection — before pouring, all supplementary reinforcement is checked for correct placement

Related terms

Want to learn more about construction terms? Visit our knowledge base at fredsdiyplans.com.

Leave a Reply

Your email address will not be published. Required fields are marked *