Snagging is the systematic inspection of a nearly finished building to identify and clear the remaining defects and outstanding items. It belongs to the phase just before and around handover: the building is essentially complete, but there are still damages, minor faults and details that are not right. These are recorded, allocated to the trades responsible and put right.

What it involves

Typical snags are scratches on frames and glass, damaged plasterboard corners, missing sealant beads, doors that bind, sockets fitted out of level and paint damage caused by other trades.

Why it pays

The quality of the last five per cent decides how a client judges the whole job. A well-built house with thirty open snags reads as careless; the same work with a clear list reads as craftsmanship. Handover also matters contractually: it usually starts the defects liability period and triggers final payment. Patent defects accepted without reservation at handover are far harder to pursue afterwards, which is exactly why a thorough inspection beforehand is worth the time.

Points to watch

Related terms

Want to learn more about construction terms? Visit our knowledge base at fredsdiyplans.com.

Leave a Reply

Your email address will not be published. Required fields are marked *