Propping is the temporary support of a building element with adjustable props, so that the element does not fail or deflect before it can carry its own load. A prop is a height-adjustable steel tube with a base plate and a head plate; in the UK it is often called an acrow prop or a floor prop. The Dutch term is onderstempelen.

When propping is needed

Three classic situations:

  1. Freshly cast concrete. Concrete only reaches its strength over days or weeks. After striking the formwork, some props stay in place until the concrete is strong enough — known as back-propping
  2. Composite and precast floor slabs. A lattice-girder or composite slab acts as permanent formwork during construction and is not yet structural. It is propped at the spacings specified by the supplier until the structural topping has cured
  3. Alterations. Before a load-bearing wall is removed in whole or in part, the floor or wall above is propped. The props only come out once the new beam is in place and fully bearing

Rules of thumb

> Removing a load-bearing wall without propping can bring a floor down without warning. Temporary works are part of the structural design, not an optional extra.

Related terms

Want to learn more about construction terms? Visit our knowledge base at fredsdiyplans.com.

Leave a Reply

Your email address will not be published. Required fields are marked *