Jacking up — Dutch *opvijzelen* — is raising a complete building or structural element with hydraulic jacks, usually so that something can be installed underneath: a new foundation, additional height, or transport equipment to move the building.

It sounds spectacular, but it is a proven technique. As long as the load is picked up evenly and the building moves as a whole, hardly any cracking occurs — precisely because the structure does not deform, it simply rises.

What it is used for

How it is done

  1. Investigation. Structural survey, ground investigation and a record of existing cracks and out-of-plumb, including photographs and monitoring points.
  2. Establish the load path. A steel yoke or grillage of beams is installed under or through the masonry, so the weight can be picked up at a limited number of points.
  3. Position the jacks. Hydraulic jacks on a stable reaction point — usually new piles or temporary support.
  4. Lift evenly. All jacks are controlled centrally, often by computer, lifting in steps of a few millimetres at a time.
  5. Monitor. Level, tilt and crack width are measured continuously throughout.
  6. Underbuild. Once the target level is reached, the permanent structure is built underneath and the jacks are released.

Points to watch