Base plate grouting is completely filling the gap between two structural elements — usually beneath the base plate of a steel column or a machine — with a purpose-made pourable grout. The point is that the load is transferred evenly across the whole bearing area, rather than through a few small packing shims. The Dutch term for the operation is ondersabelen.

Why it is necessary

A steel column is first levelled on shims or levelling nuts. That leaves a gap of typically 20-50 mm between the base plate and the concrete. Without grouting:

Where it is used

  1. Steel columns on pad foundations and concrete slabs
  2. Heavy machinery and plant requiring a large bearing area
  3. Noise barriers, bridge parapets and portal frames in infrastructure work
  4. Wall panels and precast concrete units set on a prepared base

Method and pitfalls

Related terms