What is a setting-out peg?
A setting-out peg is a slim timber or steel stake driven into the ground to fix a point on site. Together, pegs form the dimensional basis of a building: they mark corners, grid lines, service runs and levels before earthworks begin.
What they are for
- Corners and grid lines of a building, patio, shed or wall.
- Level. A nail or mark on the peg records a known level exactly: the finished floor level, for instance, or a round figure below it.
- Service runs for drainage, land drains, cables and foundations.
- Excavation limits of a pit or trench.
In practice
Pegs are by nature temporary and vulnerable: they sit exactly where the excavator needs to work. That is why builders use profile boards (also called batter boards): two posts with a horizontal board across them, set up clear of the excavation. The lines are marked on the board; a string line between two profiles puts the grid line back on the ground at any time, even after the pegs have been dug away.
Step by step on a small job
- Establish one fixed reference — an existing wall, boundary or benchmark that will not move. Record that level and write down where it is.
- Drive pegs at the corners, heads just above ground, with the exact position marked by a nail head.
- Check square using the diagonals. On a rectangle both diagonals must be exactly equal. Otherwise use the 3-4-5 rule: three metres along one side, four along the other, and the diagonal must be exactly five.
- Set profile boards clear of the work, roughly a metre back from the excavation, and transfer the lines onto them.
- Record every dimension on paper or in a photo, measured from two fixed points, so a lost peg can be reinstated.
Common mistakes
- Driving pegs into loose ground or in the traffic route. They shift or vanish unnoticed — and a shifted peg only shows up once the foundation is out of line.
- Transferring levels by eye or with a spirit level on the ground. Use a level instrument or a water level over the full length; across ten metres a centimetre of error builds up fast.
- Relying on a single reference point. Without a second, independent check, an error in the first point is never caught.
- Setting out without knowing the boundary. When building near a boundary, check the registered position before driving a peg, not afterwards.