A levelling course is the first course of bricks or blocks in a wall, bedded dead level in mortar on the foundation right around the building. In Dutch it is called the kimlaag, from kim, the line where wall and floor meet — a word that originally meant edge.

The course has one main job: to absorb every irregularity in the substrate, so the rest of the wall can be built true and to size.

Why this course decides the rest

How it is done

  1. Find the highest point — survey the foundation all round with a laser or water level and start at the highest point
  2. Damp-proof course — install it according to the detail on the drawing
  3. Lay the mortar bed — in cement mortar, even when the wall above is thin-joint glued: thin-bed mortar gives no room to adjust
  4. Set the units — level, plumb and in line; check every one
  5. Let it cure at least a day — only then build on, or the weight will squeeze the course down
  6. Carry on — the rest of the wall in thin-bed or ordinary mortar

Points to watch

Related terms

Want to learn more about construction terms? Visit our knowledge base at fredsdiyplans.com.

Leave a Reply

Your email address will not be published. Required fields are marked *