What is a drying accelerator for sand-cement screed?

A drying accelerator for sand-cement screed is an additive mixed into the screed mortar so that the screed dries faster and can receive a finish sooner. It shortens the waiting time before parquet, tiles or a poured floor can be installed.

How does a drying accelerator work?

Standard sand-cement screed needs a lot of water to be workable. For laying tile adhesive, parquet or poured flooring, the residual moisture must be low. With natural drying, the rule of thumb is 1 cm per week — for a 60 mm screed that means almost two months.

A drying accelerator reduces the required water, binds excess water or accelerates hydration of the cement. As a result the screed can be ready for finishing after 1 to 2 weeks. Some products are added to the mixing water; others are pre-mixed dry screeds.

Application

Points of attention

Related terms

Looking for more DIY plans? Check out fredsdiyplans.com.

Leave a Reply

Your email address will not be published. Required fields are marked *