A wooden deck is one of the best investments for your outdoor space. Warmer than concrete, more natural than pavers, and you can build it yourself in a weekend.

Here’s everything you need to know.


Which Wood for Your Deck?

Wood Price per sq ft Lifespan Notes
Pressure-treated pine $1.50 – $3 15–20 years Cheapest, needs staining
Cedar $3 – $6 15–25 years Naturally resistant, beautiful
Douglas fir $2.50 – $5 15–25 years Strong, affordable
Redwood $5 – $10 20–30 years Premium look, naturally resistant
Ipe (hardwood) $8 – $15 25–40 years Extremely dense, minimal maintenance
Composite (WPC) $5 – $12 25+ years No splinters, low maintenance

Best value: Cedar or pressure-treated pine offer the best cost-to-performance ratio for most homeowners.


DIY vs. Contractor

Build It Yourself (16×20 ft / 5×6 m)

Item Cost
Decking boards (cedar) $400 – $700
Pressure-treated framing lumber $200 – $350
Concrete deck blocks or piers $50 – $100
Stainless steel screws or hidden clips $60 – $100
Weed barrier $20 – $40
Wood sealer/oil $40 – $70
**Total** **$770 – $1,360**

Your hourly rate: With 32 hours of work and $4,000 saved vs. a contractor: $125 per hour.

Hire a Deck Builder (16×20 ft)

Item Cost
Materials $770 – $1,360
Labor (50–80 hrs at $50–80/hr) $2,500 – $6,400
Overhead + markup $300 – $800
**Total** **$3,570 – $8,560**

Your savings: $2,800 – $7,200


Step 1: Planning and Preparation

Determine size and layout:

Plan around standard board widths to minimize waste. Cedar decking commonly comes in 5/4×6 in boards.

Check for permits:

Most states require permits for decks attached to the house or over 200 sq ft. Freestanding ground-level decks often don’t need permits. Always verify with your local building department.

Prepare the ground:

  1. Remove sod or vegetation
  2. Add 3–4 in of gravel for drainage
  3. Lay weed barrier

Step 2: Build the Frame

The frame carries the deck load. Use pressure-treated lumber rated for ground contact (UC4) for all framing.

Frame components:

Build order:

  1. Set concrete deck blocks or pour piers
  2. Install outer rim joist frame
  3. Check square: measure diagonals (must be equal)
  4. Add interior joists with joist hangers
  5. Level everything with a long level

For an attached deck: A ledger board bolts to the house rim joist. This requires flashing to prevent water infiltration — don’t skip this step.


Step 3: Lay the Decking Boards

Board spacing:

Leave 1/4–3/8 in gap between boards for drainage and wood movement. Use a screw or spacer block for consistency.

Fastening methods:

Face screwing (traditional):

2 screws per board at each joist. Countersink slightly for a clean look.

Hidden fasteners (cleaner look):

Clips grip the board edge — no visible screws. Adds time but results look professional.

Pro tips:


Step 4: Railings and Stairs

When do you need railings?

Most building codes require railings when the deck is 30 in or more above grade. Even for lower decks, railings add safety and definition.

Common railing options:

Stairs:


Step 5: Finish and Maintain

Immediately after building:

Apply a water-repellent sealer or oil. This protects from moisture and UV right away.

Maintenance schedule:

Cleaning:

Spring cleaning with a deck cleaner and soft brush. Low-pressure washing (max 1,500 PSI) is fine — high pressure damages wood fibers.


Cost by Size

Size DIY Cedar Contractor Savings
10×12 ft $450 – $750 $2,200 – $5,000 $1,750 – $4,250
16×20 ft $770 – $1,360 $3,600 – $8,600 $2,830 – $7,240
20×24 ft $1,100 – $1,900 $5,000 – $12,000 $3,900 – $10,100

The 5 Most Common Deck Mistakes

1. No weed barrier

Without it, weeds grow through the gaps within a year — almost impossible to remove once established.

2. Insufficient ventilation

Framing directly on soil traps moisture and accelerates rot. Always allow at least 6 in of clearance between soil and framing.

3. Wrong screws

Regular steel screws rust and leave ugly brown streaks. Always use stainless steel or hot-dipped galvanized screws for exterior decking.

4. No board spacing

Wood expands. No gap = buckling boards after the first hot summer. Minimum 1/4 in, ideally 3/8 in.

5. Skipping the sealer

The underside and cut ends of boards are most vulnerable. Seal all sides — including the bottom and cut ends — before installation.


Frequently Asked Questions

Do I need a permit to build a deck?

Depends on your location and deck specs. Attached decks over 200 sq ft almost always require permits. Check with your local building department before starting.

How long does it take to build a deck?

Two people can build a 16×20 ft deck in 2 weekends. With good prep (plans, pre-cut material), it goes faster.

What’s the most low-maintenance deck material?

Composite decking (WPC) requires the least maintenance — just clean it once a year. Ipe hardwood is the most durable natural wood option with minimal upkeep.

Can I build a deck over an existing concrete patio?

Yes — use concrete anchors to attach post bases to the slab, then frame on top.

How long will a DIY deck last?

Cedar with regular sealing: 20–25 years. Pressure-treated pine with maintenance: 15–20 years. Hardwood or composite: 25–40 years.


Conclusion: Build a Deck This Weekend

A wooden deck is one of the best DIY projects for your home. It adds living space, increases home value, and you can build it yourself for a fraction of what a contractor charges.

All you need is a good plan.