Building a partition wall yourself costs between €50 and €300 in materials, depending on the type and size. Having it done by a plasterer or joiner will cost €200 to €600 for a standard wall. DIY is well within reach for a home improver with basic experience. In this article you’ll find step-by-step guides for both a timber stud partition wall and a plasterboard wall.

Which Wall Type for Which Situation?

Type Best for Costs
**Timber stud (batten and board)** Quick, straightforward, temporary or permanent €50 – €150
**Plasterboard (system wall)** Fire-resistant, professional finish €80 – €200
**Solid masonry (blocks)** Permanent, load-bearing wall €200+ (contractor recommended)
**Half-height partition** Visually dividing a space while letting light through €40 – €120

Important: If you are removing an existing wall or building a wall that affects the structure of the building, always consult a structural engineer or building contractor.

Type 1: Timber Stud Wall with Plasterboard (Most Popular DIY Method)

Materials (wall 300 cm wide, 250 cm high, without door)

Material Size Quantity Price
Sawn timber 38 × 89 mm (studs) 250 cm 7 pieces €25 – €40
Sawn timber 38 × 89 mm (top/bottom plates) 300 cm 2 pieces €12 – €20
Plasterboard 12.5 mm 300 × 250 cm 4 sheets €40 – €80
Glass wool / mineral wool 80 mm 3 m² 1 pack €20 – €35
Joint compound + paper tape €15 – €25
Primer + emulsion paint €20 – €40
Screws, wall plugs €10 – €15
**Total** **€142 – €255**

Step-by-Step Guide: Timber Stud Partition Wall

Step 1: Plan the location

Step 2: Fix the bottom plate

Screw the bottom plate (38 × 89 mm) to the floor at the desired position. Use wall plugs for a concrete floor or screws for a timber floor. Check with a spirit level.

Step 3: Fix the top plate

Drop a plumb line from the corners of the bottom plate to find the exact position of the top plate. Screw the top plate to the ceiling.

Step 4: Set the studs

Cut the studs to length (height = floor to ceiling minus 2 × plate thickness = room height − 18 cm). Check each stud is perfectly plumb with a spirit level. Fix the studs in the top and bottom plates with a screwdriver.

Stud spacing: 600 mm centres (standard) or 400 mm for extra rigidity. Start and end with a half-spacing at the walls.

Step 5: Install insulation

Fill the cavities with glass wool or mineral wool (80 mm). This significantly improves sound insulation. Wear a dust mask when handling glass wool.

Step 6: Fix the plasterboard

Screw the plasterboard sheets to the frame with drywall screws (3.5 × 35 mm). Screw spacing: 300 mm. Leave a 3–5 mm gap at floor and ceiling (for movement).

Cut openings for sockets and light switches before fixing.

Step 7: Tape and joint

Step 8: Prime and paint

Apply a coat of plaster primer (plasterboard is highly absorbent). Then 2 coats of emulsion paint.

Type 2: Half-Height Partition Wall

A half-height wall (up to 120–150 cm) divides a room visually without fully closing it off. Light and air pass over the top, but the zones are clearly separated.

Applications:

Materials (150 cm wide, 120 cm high):

The construction is the same as a full wall, just shorter.

Finishing the top: Use a solid timber board as the top (oak or pine, 4–5 cm thick). This gives the half-height wall a finished look and can serve as a shelf or bar worktop.

Improving Sound Insulation

A standard stud wall with plasterboard achieves a sound reduction of approximately 35–45 dB. Want more?

Addition Extra dB Cost
Double layer of plasterboard +5–8 dB +€20–€40
Acoustic mineral wool (instead of standard) +5 dB +€10–€20
Resilient bar (decoupled frame) +8–12 dB +€50–€100

Adding a Door

Build a door opening by adapting the stud layout:

Standard interior door width: 83 cm. Structural opening in the frame: 87 cm (clearance for the door lining).

Common Mistakes

  1. Frame not plumb. Check studs with a spirit level — otherwise the door won’t hang correctly in the lining.
  2. Too few studs. With more than 600 mm spacing, the plasterboard flexes when pushed.
  3. Plasterboard too tight against wall/ceiling. Leave 3–5 mm for shrinkage — otherwise the joint compound will crack.
  4. No sound insulation. A stud frame without insulation sounds hollow and allows too much noise through.

Frequently Asked Questions

Am I allowed to build a partition wall in my own home?

Yes, non-load-bearing partition walls can be built without planning permission. If the work involves an external wall, a load-bearing internal wall, or if asbestos is suspected, always have the work assessed by a specialist first.

How do I know if a wall is load-bearing?

Load-bearing walls typically run at right angles to the floor joists. An internal wall on the ground floor that continues on the floor above is likely load-bearing. If in doubt, have a structural engineer assess it.

How much does it cost to have a partition wall built professionally?

For a non-load-bearing partition of 10 m², expect to pay €500–€1,200 including plastering and painting. Doing it yourself costs €100–€250 in materials.

Ready to start building with professional plans? At fredsdiyplans.com you’ll find building plans for all your wood projects, complete with material lists and step-by-step instructions.


Ready to get started? Browse thousands of step-by-step plans at fredsdiyplans.com.

Leave a Reply

Your email address will not be published. Required fields are marked *