What is the final design (DO)?

The final design (DO) is the design stage in which the preliminary design is developed into a permittable plan with final materials, dimensions and construction details.

What is a sub-designation in a zoning plan?

A sub-designation is an additional, more specific land-use designation within a primary zoning category that lets a municipality fine-tune what is allowed on each part of a site.

What is the threshing floor?

The threshing floor is the central, elongated floor of a hall-house barn used for threshing grain, storing harvest and unloading wagons.

What are decorations in construction?

Decorations in construction are non-structural ornaments and embellishments on façades, ceilings and interiors that enrich a building aesthetically and tell its story.

What is deconstructivism?

Deconstructivism is a 1980s architectural movement that breaks the classical rules of form, line and symmetry with fragmented, tilted and unstable shapes.

What is flow rate?

Flow rate is the volume of a liquid or gas passing through a pipe, duct or opening per unit of time, used widely in ventilation, plumbing and heating design.

What is DBFM(O)?

DBFM and DBFMO are integrated construction contracts in which design, build, finance and (often) maintenance and operation are bundled with a single contractor.

What is the dew point?

The dew point is the temperature at which water vapour in the air condenses into liquid water. A core concept in building physics for understanding damp and condensation.

What is a threshing floor door?

A threshing floor door is the wide double door of a hall-house barn that allowed loaded harvest wagons to enter the central threshing floor.

What is a sheet pile wall?

A sheet pile wall is a vertical retaining structure made of interlocking steel, timber or concrete sections driven into the ground to hold back soil and water.