Natural stone replacement is cutting out a damaged or worn stone and setting a matching new one in its place. In building conservation the partial replacement of decayed stone is called indenting. It is painstaking work, because the new stone has to match not just in size but in type, colour, bedding direction and surface finish.

Repair or replace?

Repair, slip indent or full replacement?Small spalled corners, hairlinecracks or surface damage→Repair with a matched repair mortarOnly the face has gone→Slip or plated indent (thinnerinset piece)Through cracks, broken-outload-bearing sections, full-depthpowdering or serious salt damage→Replace the stone
Choose the approach by the type of damage, as described in this article. Repairs use a repair mortar matched to the stone and deliberately slightly weaker than it.

The method, step by step

  1. Establish the cause. Replacing without addressing the cause gives you the same damage in five years. Look for leaking copings, rusting cramps and dowels, hard cement pointing and rising damp
  2. Identify the stone — on historic work, involve a stonemason or conservation adviser. The original quarry bed is often no longer available, so a well-matched alternative is needed
  3. Prop anything load-bearing before removing a single stone
  4. Cut the stone out by sawing or raking the joints, not by knocking it out. Neighbouring stones must survive intact
  5. Clean the bed and remove all old, hard cement
  6. Set the new stone in a lime-based mortar, with stainless dowels and cramps where the originals were iron
  7. Point up with a mortar softer than the stone — in practice, lime-based
Replacing a natural stone, step by step1Establish the causeCheck for leaking copings, rusting cramps and dowels, hard cement pointing and rising damp.2Identify the stoneOn historic work, involve a stonemason or conservation adviser.3Prop load-bearing partsDo this before removing a single stone.4Cut the stone outSaw or rake the joints, never knock it out.5Clean the bedRemove all old, hard cement.6Set the new stoneUse lime-based mortar and stainless dowels and cramps where the originals were iron.7Point upUse a mortar softer than the stone, in practice lime-based.
The working order for natural stone replacement. On historic work, involve a stonemason or conservation adviser; on a listed building consent is almost always required.

Points to watch

Related terms

Want to know more about building terms? Visit our knowledge base at fredsdiyplans.com.

Leave a Reply

Your email address will not be published. Required fields are marked *