Airtight construction means creating one continuous airtight layer around the heated part of a building, so that no uncontrolled air flows through joints, laps and junctions. It is not about taping up ventilation grilles; it is about eliminating the draughts you have no control over.

The building physics rule of thumb: insulating without air sealing is half a job. A gap of a few millimetres running right through the construction loses more heat than a decent area of poor insulation — and worse, it carries moist indoor air into the structure.

Why it matters

The rule: tight inside, open outside

The airtight and vapour-control layer goes on the warm inner side; a water-resisting but vapour-open layer goes on the cold outer side. Moisture that does get in can then dry outwards. The classic mistake is a vapour-tight layer on the outside: moisture goes in but cannot get out.

Leakage points in order of importance

  1. Window frame to wall junction
  2. Roof plane — laps in the vapour-control membrane and the junctions at wall plate and ridge
  3. Penetrations — electrical boxes, pipes, ventilation ducts, roof penetrations
  4. Ground floor to external wall junction — the perimeter strip
  5. Loft hatch, crawl space hatch and meter cupboard
  6. Floor and ceiling junctions where timber joists are built into the wall

Getting it right on site

Related terms