Climbing formwork “climbs” one pour at a time: once a lift of concrete has cured, the formwork system is struck, lifted and anchored to the concrete that was just cast below it. That way a wall, core or pier is built upwards lift by lift, without needing scaffolding or propping all the way from the ground.

There are two main variants. With crane-handled climbing formwork the tower crane lifts the unit to its next position. With self-climbing formwork, hydraulic jacks do that, pushing off climbing cones cast into the concrete; that variant is crane-independent and therefore insensitive to wind and crane availability.

Difference from slipform

Climbing formwork Slipform
Method in stages, one lift at a time continuous, pouring day and night
Height per stage usually about 2.5 to 4.5 m continuous, several metres a day
Joints a horizontal construction joint per lift virtually seamless wall
Flexibility cross-section can change per lift cross-section essentially constant
Organisation normal working days shift work, cannot be interrupted

Where it applies

Points to watch

Related terms