A first course block is the unit used in the bottom course of a wall, laid straight onto the foundation or the floor slab. Together those blocks form the levelling course — the first course, set dead level, on which the whole wall is then built.

The Dutch term is kimblok, from kim, meaning edge: the line where wall and floor meet. The term is used mainly in thin-joint work with large blocks and elements, such as calcium silicate units.

Why the bottom course is treated separately

How it is done

  1. Mark out the foundation — set out the wall lines and find the highest point of the foundation; that is where you start
  2. Damp-proof course — where specified, lay a DPC membrane, EPDM strip or bituminous layer
  3. Mortar bed — spread a bed of cement mortar, thick enough to allow levelling
  4. Set the blocks — block by block, level and plumb, neatly in line
  5. Let it set — give the course at least a day to gain strength before stacking on it
  6. Build on — the rest of the wall follows in thin-bed or ordinary mortar

Points to watch

Related terms

Want to learn more about construction terms? Visit our knowledge base at fredsdiyplans.com.