Screed is the levelling layer applied over a structural floor slab on which the final floor finish — wood, tiles or carpet — is laid. In German-speaking countries it is called Estrich; in the Netherlands “dekvloer” or “afwerkvloer”. Screed serves several functions and is a key part of any modern floor build-up.

Functions of a screed

The screed performs several tasks:

Types of screed

Type Binder Application
Sand-cement screed Portland cement General use, dwellings, commercial
Anhydrite screed Calcium sulphate Underfloor heating, fast drying
Magnesium screed Magnesium oxide Industrial, sometimes heritage
Asphalt screed Bitumen Industrial floors
Resin screed Epoxy, PUR Industrial, chemical-resistant

Forms of installation

Bonded screed

The screed is laid directly onto the slab and bonds to it. Quickest solution, thinnest build-up (from 25 mm).

Floating screed

The screed rests on an insulation layer (rigid insulation or acoustic insulation) without contact with the walls or slab. Requires:

Advantage: better acoustic insulation and suitability for underfloor heating.

Screed on separating layer

A separating membrane sits between the screed and the slab. The screed can shrink independently without cracking the finish.

Screed and underfloor heating

For underfloor heating, anhydrite screed is popular because it:

The heating may only be commissioned after a rest period (often 7 days), with a gradual temperature increase to dry the screed.

Application rules

  1. Prepare the substrate — clean, level, strong enough
  2. Place edge strips along all walls and columns
  3. Plan movement joints for large areas (>40 m²)
  4. Mix and lay — observe the minimum thickness
  5. Compact and finish — sand-cement often machine-finished
  6. Curing and drying — sand-cement at least 28 days, anhydrite faster
  7. Moisture testing before laying t
    Laying a screed step by step1Prepare the substrateClean, level and strong enough.2Place edge stripsAlong all walls and columns.3Plan movement jointsNeeded for large areas (>40 m²).4Mix and layObserve the minimum thickness.5Compact and finishSand-cement is often machine-finished.6Cure and drySand-cement at least 28 days, anhydrite faster.7Test moistureBefore laying the floor finish.
    The application rules for a screed, from preparing the substrate to moisture testing.

    he floor finish