Part 2 focuses on modern, contemporary dormers. Since the 1960s the dormer has evolved from a handcrafted element to an industrial prefab product that can be installed on the house in a single day. These examples show how material, form and construction method have changed.

Standard flat-roof dormer (1960s–1980s)

The most common dormer in terraced houses:

Wide and continuous dormers

For loft conversions that maximise headroom, a continuous dormer is often used:

Prefabricated dormers

Modern prefabricated dormers are assembled in the factory:

Architecturally distinctive dormers

In contemporary detached houses or considered renovations, creative versions appear:

Application

Modern dormers are often ordered through a specialist company that takes care of installation, finishing and planning permission. Lead times are typically 6 to 12 weeks.